The consultancy for the Majlis Grande Mercure started in 2017, with construction starting in 2019.
The brief was to develop a spa on the 9th floor with an additional ten floors above the spa and a roof top swimming pool on the adjacent building with an air bridge.
We developed a male and female area within the spa plus a very noble VIP suite for couples.
Under construction.